Friday, 21 August 2015

Adding the next extension.

I have decided where to extend the layout and have purchased two points to use for the extensions. First problem was removing ballasted track to fit a point. I was able to pull it up and fit the point but the level wasn't right and I have had to pack a few bits of cork in place to level up the track. I ran a few engines over it and although it is not perfect the trains will pass over it without falling off the track. Re-ballasting will come later as it's not my favourite task.

As this point is at the front of the layout I will be able to operate it manually, so no point motor is involved. Here is a picture of a train over the point.

No comments:

Post a Comment