Friday 17 August 2018

Further progress

The track has been moved slightly so that there will be a clear straight section at the front left of the baseboard, this is so a drop down section can be added to give access to the centre and rear of the layout. this is the first stage of creating that entrance.

Clicking on the picture will bring up a larger version.

I can now get into the centre left of the layout to reach the rear section. The drop down section does not quite go right down at present, due to the length of the bolts holding the hinge in place, these will need to be shortened, then the dropped section will drop 90 degrees to give me a clear access point.

In the next step a second access point needs to be created now at the right hand end of the layout. I can then start wiring the drop down sections and relaying the track.

1 comment:

  1. After having probems keeping the track aligned especaially at left hand side where straight joins curve, this has been abandoned.

    ReplyDelete