Testing the first bit of track.(Click the link)
Friday, 17 April 2020
A bit more progress and some testing.
Tuesday, 14 April 2020
A transition - goodbye unfinished layout, start of a new one.
Taking it apart was fun as I wasn't sure which bits were holding the other bits up
Now to reconstruct a baseboard with a space in the middle to make access easier.
It needed a couple of new legs for support but its nearly ready to use, I just need to design a layout to fit now.
I had better clear everything off the boards first, watch this space.
Thursday, 9 April 2020
Testing a few loco's before the layout goes
I have decided the layout has too many issues to be continued with so I will be seeing if I can redesign it in a more accessible way, and with more action areas at the front. This may involve removing all the baseboards and rebuilding them, so that will be fun. I'm not sure which bits hold up which other bits at present, so anything could happen when I start dismantling it.
Anyway, below is the link to the video of the trains this week, just click on it to go to youtube, and make it full screen for better viewing.
Friday, 27 March 2020
Tidying up
Remember you can click on the pictures to see bigger versions. That connector is temporary by the way, I need to solder a proper wired connection between the tracks soon. Bye for now, more work to do.
Wednesday, 29 January 2020
Adding a bit more platform to the station
The next step is to build a bit more on the ends which will slope down to rail level.
Tuesday, 14 January 2020
Building the railway station, with help from Morgan
It does look quite good now it is finished but it required a lot of delicate work around the platform canopy, whch cannot be rushed. Here is the front (street side of the building with and without it's canopy.
The station platform has a roof but one of the panels has gone missing somewhere in the house (I blame the cat) so I've constructed a temporary one which can be replaced if the real part turns up. Here is the platform side, with and without the roof.
I just need to build some additional platform each side now to create a sensible length of station for the layout.
Tuesday, 7 January 2020
Happy New Year - and good service from Metcalfe
I should have a sheet A, B, C and D, but instead there are two sheet D in the kit and no Sheet B. I emailed Metcalfe, including the picture above and got a reply as soon as they opened after weekend. They apologised and stated they would send replacement part.
This arrived this morning (Tuesday) by first class post so I can now get on with the construction. I thought this was good service.
