Thursday, 25 June 2015

Adding the bridge

The Girder bridge is now constructed, might need a coat of paint at some time, trains have run successfully over it although there is not much clearance and a (scale) 60’ coach may be even tighter round the bend as it leaves the bridge. I have also added the under board point motor to the point that leads off to this junction, I think I need to get the electric points functioning next so I don’t have to run round the layout switching them manually.

Tuesday, 23 June 2015

Building an extension to the layout.

To use up the additional space I now have, a bit more wood cutting has been done and I have created a new junction at the back of the layout that takes trains off the 6 x 4 board onto an extension that leads to some storage sidings. A couple of Fleishman points picked up at a model rail group’s open day give me access from the single incoming track to all four of the sidings. Trains run in and out of this loop without too much trouble.

The scenic views at the back of the layout will have to be changed and there may well be a tunnel and a bridge on the extension piece. I bought a girder bridge from EHattons at the weekend and it came with one piece missing (the bag had split open) but they sent that part in the post today so I can now construct this bridge.

Monday, 15 June 2015

A few locos appear

Unpacked a few locos, and gave then a test run round the existing track, all except one seem to work ok at the moment.

Sunday, 14 June 2015

Work in progress

<

A bit more stuff has been unpacked and I have started work on the extension section where there will be some storage sidings and hopefully a turning area for locos.

Thursday, 11 June 2015

Adding a few buildings

Basically, I've been unpacking some of the boxes to see what's in them, and have laid them out on the layout temporarily, while I finish off building it. I also found the storage rack I build to be useful for minor items, until all the new tracks are in place.

Wednesday, 10 June 2015

A small step forward

Lots of other jobs to do around the house, but we have managed to make a small step forward this evening. Everything was packed away for the move, and most of it still is. I have fixed the back of the layout to the wall and have found a few of the houses that were there before. I may have to relay the road they are on, before they can be sited properly, and somewhere there will be a background scene. Remember you can click on the photos to see a larger version.

While opening boxes I found the controller and a loco, so 'Mallard' had a quick run round the track, and survived the trip without falling off or stopping, except at the platform.

Next step will be to get front supports for the baseboard and then we can consider building an extension where trains can be stored when not running. Also finding out more buildings, as they can now stay on the layout all the time as it does not have to be folded away.

Sunday, 7 June 2015

Step 2 - stand the existing baseboard up.

Well I managed to stand it up on an old table in the middle of the room. Then I refitted the original legs at the back. I have now moved it into the corner, and have established that if I leave the hole in the baseboard I can access this corner when required. The turntable that used to be in the section of baseboard where the hole is can be moved elsewhere, once I have built an extension piece with a fiddle yard. You can click on the pictures to see larger versions.

I also now have somewhere to store all the boxes in this room, they can go under the baseboard.

Friday, 5 June 2015

Step 1 - repaint the room

Nearly finished, a nice sky colour which I hope will blend in with the backscenes. And the display/storage case I built hangs nicely on the wall.


Tuesday, 2 June 2015

New house, new beginning


Well we have now moved house, which means the railway is in pieces and has to be put back together. The good news is that I can have a dedicated room, so it will not have to be folded away against the wall, that should help the ballast to stay on the track at least. It is also slightly larger that the room I had it in before so I might be able to incorporate extra track for the trains not currently running.

 Below are a few views of the room, I did lay out a bit of track to see how it was for size.

 Now I have to plan where to start, although I’m told the room has to be painted first, so I will be painting the walls sky blue.