The Girder bridge is now constructed, might need a coat of paint at some time, trains have run successfully over it although there is not much clearance and a (scale) 60’ coach may be even tighter round the bend as it leaves the bridge. I have also added the under board point motor to the point that leads off to this junction, I think I need to get the electric points functioning next so I don’t have to run round the layout switching them manually.
No comments:
Post a Comment